Russian | English |
анализ индикаторов риска | red flag review (RFR: final overall drawing (with clearly marked elevation and residual out of level) and each "wedged" plate drawing, with the 9-point real thickness mark-up, have to be transmitted and included in the installation checklist package for future RFR during commissioning. Fuat) |
анализ индикаторов риска | RFR (red flag review: final overall drawing (with clearly marked elevation and residual out of level) and each "wedged" plate drawing, with the 9-point real thickness mark-up, have to be transmitted and included in the installation checklist package for future RFR during commissioning. Fuat) |