English thesaurus - terms added by user Kenny Gray: 108 >>
1.01.2015 | 22:59:26 | abbr. O&G | WCT | water cut (The water cut (WCT), oil production rate (OPR) and water saturation (BWSAT) at the producing interval (Block 1, 1, 7) were used to evaluate the coning) |
30.12.2014 | 12:24:09 | abbr. proj.manag. | Gas Compression and Reinjection Station | GCRS |
30.12.2014 | 3:04:46 | abbr. proj.manag. | Concept Selection Document | CSD |
30.12.2014 | 2:36:31 | abbr. proj.manag. | KPC Gas Debottlenecking | KGDBN |
30.12.2014 | 2:18:03 | abbr. O&G | Sour Gas Liquids Treatment Project | SGLTP |
30.12.2014 | 2:13:19 | abbr. proj.manag. | Karachaganak Expansion Project | KEP |
30.12.2014 | 2:05:06 | abbr. proj.manag. | Plateau Extension Project | PEP |
22.12.2014 | 5:27:08 | abbr. O&G | Original Oil Water Contact | OOWC |
21.12.2014 | 0:28:29 | abbr. sec.sys. | Rescue and Fire Fighting Services | RFFS |
20.12.2014 | 23:28:07 | abbr. tech. | Deferred Defect List | DDL |
20.12.2014 | 22:38:16 | abbr. avia. | Health and Usage Management System | HUMS (The UTC Aerospace Systems Health and Usage Management System (HUMS) automatically monitors hundreds of aircraft signals and through synthesis and analysis of the data, tracks the usage and health of the aircraft and its major assemblies. With UTC Aerospace Systems HUMS on board, aircraft readiness is boosted, flight safety is enhanced and maintenance costs are lowered.) |
20.12.2014 | 22:33:08 | abbr. avia. | Engine Condition Trend Monitoring | ECTM |
20.12.2014 | 22:27:08 | abbr. avia. | AIR | airborne image recorder |
20.12.2014 | 21:49:07 | abbr. avia. | Emergency Egress Lighting | EEL |
20.12.2014 | 21:39:29 | abbr. avia. | Helicopter Emergency Egress Lighting | HEEL |
20.12.2014 | 16:19:36 | abbr. avia. | Flight Data Monitoring | FDM |
20.12.2014 | 12:58:25 | abbr. avia. | Take-off Decision Point | TDP |
25.11.2014 | 21:07:41 | abbr. O&G | Inspection, Maintenance, Monitoring and Repair | IMMR |
25.11.2014 | 21:03:32 | abbr. O&G | Emergency Pipeline Repair System | EPRS |
20.09.2014 | 23:36:44 | abbr. electr.eng. | Main Distribution Panel | MDP |
20.09.2014 | 23:35:31 | abbr. electr.eng. | Sub-Distribution Panel | SDP |
25.08.2014 | 3:49:46 | abbr. O&G | SAZ | subunconformity alteration zone |
6.08.2014 | 21:49:06 | abbr. O&G | Gas Treatment Unit | GTU (The logic for Emergency shutdown of the GTU (Gas Treatment Unit) or CPF (Central Processing Facilities) is unknown) |
6.08.2014 | 20:49:06 | abbr. O&G | GTU | Gas Treatment Unit (The logic for Emergency shutdown of the GTU (Gas Treatment Unit) or CPF (Central Processing Facilities) is unknown) |
25.08.2013 | 17:30:48 | abbr. O&G | GTW | Gas-to-Wire (Gas-to-Wire (GTW) is a means of transmitting gas energy, as with a gas pipeline or the case of LNG and/or GTL) |
27.03.2013 | 1:58:50 | abbr. logist. | No Declared Value | NDV |
27.03.2013 | 0:58:50 | abbr. logist. | NDV | No Declared Value |
7.02.2013 | 13:29:25 | abbr. | Materials and Equipment Acceptance | MEA (The Materials and Equipment Acceptance (MEA) Division was created in 1969. Prior to 1969, the Board of Standards and Appeals (BSA) was the agency having jurisdiciton. The MEA division regulates "certain materials and equipment (that) require Department of Buildings acceptance.) |
7.02.2013 | 12:29:25 | abbr. | MEA | Materials and Equipment Acceptance (The Materials and Equipment Acceptance (MEA) Division was created in 1969. Prior to 1969, the Board of Standards and Appeals (BSA) was the agency having jurisdiciton. The MEA division regulates "certain materials and equipment (that) require Department of Buildings acceptance.) |
22.01.2013 | 1:55:18 | abbr. | ASG | Apparent Specific Gravity |
18.12.2012 | 1:34:15 | abbr. construct. | Limit State Design | LSD (Limit state design (LSD) refers to a design method used in structural engineering. A limit state is a condition of a structure beyond which it no longer fulfills the relevant design criteria. The condition may refer to a degree of loading or other actions on the structure, while the criteria refer to structural integrity, fitness for use, durability or other design requirements. A structure designed by LSD is proportioned to sustain all actions likely to occur during its design life, and to remain fit for use, with an appropriate level of reliability for each limit state.) |
18.12.2012 | 0:34:15 | abbr. construct. | LSD | Limit State Design (Limit state design (LSD) refers to a design method used in structural engineering. A limit state is a condition of a structure beyond which it no longer fulfills the relevant design criteria. The condition may refer to a degree of loading or other actions on the structure, while the criteria refer to structural integrity, fitness for use, durability or other design requirements. A structure designed by LSD is proportioned to sustain all actions likely to occur during its design life, and to remain fit for use, with an appropriate level of reliability for each limit state.) |
18.12.2012 | 0:23:07 | abbr. construct. | Lateral Force Resisting System | LFRS |
17.12.2012 | 23:23:07 | abbr. construct. | LFRS | Lateral Force Resisting System |
10.12.2012 | 0:30:11 | abbr. | Sales Order | SO |
9.12.2012 | 23:30:11 | abbr. | SO | Sales Order |
6.12.2012 | 2:36:44 | abbr. O&G | Well Completions and Productivity | WCP |
6.12.2012 | 1:36:44 | abbr. O&G | WCP | Well Completions and Productivity |
25.10.2012 | 17:07:02 | abbr. construct. | C-channel | cee |
25.10.2012 | 16:52:10 | abbr. construct. | CWF | clear wood finish |
25.10.2012 | 16:07:02 | construct. | cee | C-channel |
8.10.2012 | 15:27:01 | abbr. construct. | Clear Ceiling Height | CCH |
8.10.2012 | 14:27:01 | abbr. construct. | CCH | Clear Ceiling Height |
5.10.2012 | 14:24:39 | abbr. comp., net. | Inventory Collection Service | ICS (Inventory, or the Inventory Collection Service (ICS) and Poller software component of RME, collects inventory data from the network devices and keeps the inventory updated) |
5.10.2012 | 13:24:39 | abbr. comp., net. | ICS | Inventory Collection Service (Inventory, or the Inventory Collection Service (ICS) and Poller software component of RME, collects inventory data from the network devices and keeps the inventory updated) |
29.05.2012 | 11:05:38 | abbr. bank. | BNDES | Brazilian Development Bank |
28.05.2012 | 17:02:51 | abbr. st.exch. | Competent Person's Report | CPR |
28.05.2012 | 16:02:51 | abbr. st.exch. | CPR | Competent Person's Report |
15.04.2012 | 3:04:39 | abbr. O&G | abandonment expenses | abex |
15.04.2012 | 2:04:39 | O&G | abex | abandonment expenses |
10.03.2012 | 16:34:56 | abbr. geol. | Lowest Closing Contour | LCC |
10.03.2012 | 15:34:56 | abbr. geol. | LCC | Lowest Closing Contour |
8.03.2012 | 19:27:49 | abbr. bank. | Irrevocable Confirmed Revolving Documentary Letter of Credit | ICRDLC |
8.03.2012 | 18:27:49 | abbr. bank. | ICRDLC | Irrevocable Confirmed Revolving Documentary Letter of Credit |
17.02.2012 | 23:49:42 | abbr. O&G | Light Louisiana Sweet | LLS |
17.02.2012 | 16:08:39 | abbr. manag. | Open Book Estimate | OBE |
17.02.2012 | 15:08:39 | abbr. manag. | OBE | Open Book Estimate |
5.02.2012 | 23:51:39 | abbr. oil.proc. | Charge Gas Compressor | CGC |
5.02.2012 | 22:51:39 | abbr. oil.proc. | CGC | Charge Gas Compressor |
5.02.2012 | 17:33:59 | abbr. oil.proc. | DPG | diphenylglyoxime |
17.12.2011 | 1:32:36 | abbr. med. | ULI | unique lifetime identifier |
19.11.2011 | 2:12:59 | abbr. O&G | MSC | multi-sensor caliper (Weatherford’s multi-sensor caliper (MSC) tool provides an accurate internal casing profile from an array of independent measuring, precision calibrated, carbide-tipped feeler arms.) |
16.11.2011 | 16:39:20 | abbr. nautic. | Mission to Seafarers | MtS (Loneliness, danger and separation from loved ones are just some of the problems seafarers face. Around the world, night and day, The Mission to Seafarers provides help and support to those in need. As a Christian agency, we work in more than 230 ports caring for the practical and spiritual welfare of seafarers of all nationalities and faiths.) |
16.11.2011 | 15:39:20 | nautic. | MtS | Mission to Seafarers (Loneliness, danger and separation from loved ones are just some of the problems seafarers face. Around the world, night and day, The Mission to Seafarers provides help and support to those in need. As a Christian agency, we work in more than 230 ports caring for the practical and spiritual welfare of seafarers of all nationalities and faiths.) |
15.11.2011 | 2:27:29 | abbr. oil | South-East Sumatra | SES |
15.11.2011 | 1:27:29 | abbr. oil | SES | South-East Sumatra |
15.11.2011 | 0:56:21 | abbr. oil | Surface Acquisition System | SAS |
15.11.2011 | 0:22:41 | abbr. oil | Multi-Flow Evaluator | MFE (Multi-flow evaluator (MFE) systems with different diameters including 3 1/8", 3 3/4", 4 1/4"and 5"are used to test the formation of cased or uncased wells in single or straddle packing. They are DST tools operated by using a hoisting and lowering method.) |
14.11.2011 | 23:56:21 | abbr. oil | SAS | Surface Acquisition System |
14.11.2011 | 23:22:41 | abbr. oil | MFE | Multi-Flow Evaluator (Multi-flow evaluator (MFE) systems with different diameters including 3 1/8", 3 3/4", 4 1/4"and 5"are used to test the formation of cased or uncased wells in single or straddle packing. They are DST tools operated by using a hoisting and lowering method.) |
13.11.2011 | 23:48:01 | abbr. manag. | Document Control Custodian | DCC |
13.11.2011 | 22:48:01 | abbr. manag. | DCC | Document Control Custodian |
8.10.2011 | 14:16:07 | abbr. O&G | capillary pressure curve | cap curve |
8.10.2011 | 13:16:07 | O&G | cap curve | capillary pressure curve |
5.10.2011 | 20:20:50 | abbr. geol. | Gas Expansion Factor | GEF |
5.10.2011 | 19:56:42 | abbr. geol. | Geological Chance of Success | GCoS |
5.10.2011 | 19:20:50 | abbr. geol. | GEF | Gas Expansion Factor |
5.10.2011 | 18:56:42 | geol. | GCoS | Geological Chance of Success |
2.10.2011 | 17:53:19 | abbr. geol. | Gross Rock Volume | GRV |
2.10.2011 | 16:53:19 | abbr. geol. | GRV | Gross Rock Volume |
7.09.2011 | 6:05:38 | abbr. ed. | Academic Affairs Standards Council | AASC |
7.09.2011 | 5:05:38 | abbr. ed. | AASC | Academic Affairs Standards Council |
7.09.2011 | 3:38:08 | abbr. nautic. | Suction Embedded PLate Anchor | SEPLA |
7.09.2011 | 2:47:03 | abbr. nautic. | Vertical Loaded Anchor | VLA |
7.09.2011 | 2:38:08 | abbr. nautic. | SEPLA | Suction Embedded PLate Anchor |
7.09.2011 | 1:47:03 | abbr. nautic. | VLA | Vertical Loaded Anchor |
7.09.2011 | 0:43:39 | abbr. O&G, oilfield. | STP | submerged turret production (The STP system is a unique, innovative and flexible turret mooring system for floating production and offtake vessels (FPSO) making it suitable for a wide range of applications.) |
6.09.2011 | 19:54:29 | abbr. oil | SBPD | standard barrels per day |
6.09.2011 | 15:56:40 | abbr. oil.proc. | Gas Heated Heat Exchange Reforming | GHHER |
6.09.2011 | 14:56:40 | abbr. oil.proc. | GHHER | Gas Heated Heat Exchange Reforming |
6.09.2011 | 3:41:58 | abbr. O&G | Production, Drilling and Quarters | PDQ |
6.09.2011 | 2:41:58 | abbr. O&G | PDQ | Production, Drilling and Quarters |
5.09.2011 | 23:15:43 | abbr. O&G, oilfield. | SCR | steel catenary riser |
4.09.2011 | 2:32:09 | abbr. O&G | Central Pontoon Semi-submersible | cp semi |
4.09.2011 | 1:32:09 | O&G | cp semi | Central Pontoon Semi-submersible |
1.08.2011 | 16:55:15 | abbr. O&G | Upper Completion | UC |
1.08.2011 | 15:55:15 | abbr. O&G | UC | Upper Completion |
15.08.2010 | 18:14:59 | abbr. tech. | Line Pipe Thread | LPT |
15.08.2010 | 17:14:59 | abbr. tech. | LPT | Line Pipe Thread |
2.06.2010 | 14:37:51 | abbr. tech. | A2B | anti-two block (a device which alarms when the hook block approaches the sheave) |