Subject: upstream O&G Amendment of construction scope at P-01 condensate outlet and existing LCV drain: Tie-in point moved from P-01 LCV to P-01 condensate exit nozzle; demolition work to include two drain lines from upstream of the existing LCV (клапан контроля уровня), blinded off at the drain header.Помогите разобраться с upstream. |
Два дренажных трубопровода с подсоединением до клапана контроля уровня |
You need to be logged in to post in the forum |