DictionaryForumContacts

 Mesmerized

link 13.10.2006 13:41 
Subject: risk retention
Financing structured with TSF assistance is excluded from this requirement, unless the BU risk retention exceeds $3 million (for example, under the insured receivable program). In this case, approval from the FRC is required.

последний вопрос на сегодня - risk retention?
Thanks in advance.

 Irisha

link 13.10.2006 14:08 
дословно я понимаю это как "сумма, подверженная риску". Принимаемый риск ????

 

You need to be logged in to post in the forum