Subject: valve position (open/close), and isolation blind are set with caution tags gen. План ОТ И ТБ для завода СПГBefore start of the work, construction supervisor and pre-commissioning supervisor jointly check and confirm that the precautions/measures are provided and observed as per the “Permit to Work”. Не совсем понимаю фразу "valve position (open/close), and isolation blind are set with caution tags " и до конца. Спасибо большое. |
да |
Спасибо. |
You need to be logged in to post in the forum |