Subject: Valve, transfer 6-way, 3.00
позиции в списке запчастей к шаровой мельнице:

"Low Pressure Assembly:
Filter Elements - 20 microns
Valve, transfer 6-way, 3.00
Valve, Control"

и т.д.

Может кто подсказать, что есть "Valve, transfer 6-way, 3.00"?

Спасибо

 mmzg

link 15.11.2010 8:24 
Монги, я так помню, интернет у Вас откручен, ссылку Вам давать бесполезно?

 mmzg

link 15.11.2010 8:31 

 Монги

link 15.11.2010 8:33 
mmzg,

ссылку - бесполезно. За картинку - СПАСИБО!

... но как перевести "6-way, 3.00" я пока все равно без понятия...

 mmzg

link 15.11.2010 8:33 
Ух ты! Иаа смог, иа маладецц :) Картинка не вставлялась, ругался 1025й ошибкой, но я оказался упорней :)

The 6-Way Directional Valve A block simulates a configuration of hydraulic continuous 6-way directional valve with pump port P, two return ports T and T1, and three actuator ports A, B, and C. Use the valve for applications with two actuators, each being controlled by a valve of this type. When both valves are in neutral position, the pump is unloaded. If any of the valves is shifted from neutral, the diverting line is cut off and the respective actuator is fed at fuel pump pressure. For more details, see the Front-Loader Actuation System demo (sh_front_loader_actuation_system), which uses a similar system of two valves.

The 6-Way Directional Valve A block has six hydraulic connections, corresponding to the valve hydraulic ports (A, B, C, P, T, and T1), and one physical signal port connection (S), which controls the spool position. The block is built of six Variable Orifice blocks, connected as shown in the following diagram.

All blocks are controlled by the same position signal, provided through the physical signal port S, but the Orifice orientation parameter in the block instances is set in such a way that positive signal at port S opens the orifices colored blue in the block diagram (orifices P-A, B-T, and P-C2 ) and closes the orifices colored yellow (orifices A-T1, P-B, and P-C1). As a result, the openings of the orifices are computed as follows:

where

hPA Orifice opening for the Variable Orifice P-A block
hPB Orifice opening for the Variable Orifice P-B block
hAT1 Orifice opening for the Variable Orifice A-T1 block
hBT Orifice opening for the Variable Orifice B-T block
hPC1 Orifice opening for the Variable Orifice P-C1 block
hPC2 Orifice opening for the Variable Orifice P-C2 block
hPA0 Initial opening for the Variable Orifice P-A block
hPB0 Initial opening for the Variable Orifice P-B block
hAT10 Initial opening for the Variable Orifice A-T1 block
hBT0 Initial opening for the Variable Orifice B-T block
hPC10 Initial opening for the Variable Orifice P-C1 block
hPC20 Initial opening for the Variable Orifice P-C2 block
x Control member displacement from initial position
For information on the block parameterization options, basic parameter descriptions, assumptions and limitations, global and restricted parameters, see the 4-Way Directional Valve block reference page.

 Enote

link 15.11.2010 8:34 
арматура распределительная 6-ходовая

 mmzg

link 15.11.2010 8:34 
Вооот. Такие пироги. Надеюсь, смог помочь.

 Монги

link 15.11.2010 8:38 
!!!!!!!

mmzg - БЛАГОДАРЕН!!!

Enote - и Вам спасибо большое.

 mmzg

link 15.11.2010 9:49 
Дык, как гаварицца, хорошему человеку... :)

 