Subject: the conductor was driven and cemented instead of being drilled O&G Подскажите, что сделали с направляющей колонной вместо бурения??? the conductor was driven and cemented instead of being drilledКонтекст: The drilling program was optimised by using more advanced technology that has been proven within the industry. The wells drilling duration was shortened from 12 to 8 days per well by introducing several technical changes: the conductor was driven and cemented instead of being drilled; спасибо.
|