Subject: 100 Te of 10 mm CS ball filling in the end-shield was completed in a week's time. nucl.pow. Помогите, пожалуйста, перевести следующие предложения:100 Te of 10 mm CS ball filling in the end-shield was completed in a week's time. 21 m high Turbo-Generator (TG) block-columns have been cast in just two lifts. Речь идёт о строительстве блока АЭС. |
imho 100 Te of 10 mm CS ball filling in the end-shield - сасыпали 100 тон шариков ис углеродистой стали 10 мм в экран (реактора?) |
You need to be logged in to post in the forum |