|
link 20.09.2007 14:06 |
Subject: outside the terminal While the GTCC power generating system is operating during the day, the generating system, the cryogenic power generator and expansion turbine generator provide sufficient power to meet all the electric needs at Himeji LNG Terminal and to supply surplus electricity for retail to users outside the terminal.
|
В чем вопрос? покрытие потребности в электричестве на терминале и вне его.... |
и для поставки избыточной электроэнергии для продажи потребителям вне терминала. |
You need to be logged in to post in the forum |