Subject: плиз ПИСЬМО
Получив и рассмотрев предложение Оператора об отказе от испытания скважины ХХХХ считает, что принятие решения отказа от испытаний скважины преждевременным, противоречащим утвержденному техническому проекту и не отвечающим целям бурения первой разведочной скважины

 паша7

link 4.09.2007 13:22 
Having received and considered the Operator’s proposal to refuse well testing KMT considers that the decision on well test refusal is premature as it contradicts the approved technical design basis and does not meet the objectives of the drilling the first exploration well

 Dr. Jekyll

link 4.09.2007 13:33 
имхо:
With reference to the reasons the Operator citing in its letter for refusing to drill the first well ХХХ assumes that this decision not to test the well is premature, clashing with the field development concept and failing to address the needs of drilling the first exploration/appraisal well.

 паша7

link 4.09.2007 13:41 
ПЛИЗ ПРОВЕРЬТЕ

Из предоставленного Оператором обоснования такого решения можно выделить три главных вопроса

From the grounds of this decision provided by the Operator three main issues can be marked:

Оператор должен быть готов к испытаниям объектов вызвавших интерес во время проводки скважины

the Operator should be ready for tests of facilities which arose interest during the hole making
:

 Dr. Jekyll

link 4.09.2007 13:49 
imho:
In the Operator’s letter making its case for such decision three main issues can be singled out:

the Operator should be prepared to test target horizons showing some prospects/potential while drilling has been in progress/underway.

 