|
link 15.01.2017 9:18 |
Subject: total protective beam O&G, oilfield. Делаю тестовый перевод по нефтедобыче в северных водах. Вот контекст:-During offloading (including approach and connection procedure) the tanker will always be protected by minimum a 25 m fixed structure (typical the diameter of one GBS leg) oThe two icebreakers working in front of the structure has beams of 34 and 44 m which can be added to the total protective beam given by GBS leg + icebreakers |
You need to be logged in to post in the forum |