construct. |
when calculating the tentative cost the total investment, the cost of the construction and erection work, the plant reconstruction cost, the cost of the utility systems, the local conditions, the prices of the local materials, the local wage rates, climatic and seismic conditions, nature of the work on the site development must be allowed for |