| |||
casing swage (Alexander Demidov) | |||
landing joint (Landing Joint: Riser joint installed temporarily above the telescopic joint and used to land the BOP stack on the wellhead. Source: API Specification 16Q, Design, Selection, Operation, and Maintenance of Marine Drilling Riser Systems, Second Edition, April 2017 Edna) |