progr. |
for example, the manufacturer of a VF drive unit must provide CE marking for the LV directive, but not for the EMC directive as this is the responsibility of the panel builder or machine manufacturer who must follow correct installation methods for the drive, cabling and motor (см. Programmable Controllers – An Engineer's Guide by E.A. Parr 2003) |