critical path | критический путь (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) |
critical path method | метод критического пути (A project management method of calculating the total duration of a project based on individual task durations and their dependencies) |