Russian | English |
назначенный ресурс до капитального ремонта | design time between overhauls (1500-hour design time between overhauls, also designated as the GO-300. WK Alexander Demidov) |
ресурс до капитального ремонта | service before overhaul (если не в часах. It is a 1930's design meant to deliver 100000 km of service before overhaul, with one valve job along the way. Alexander Demidov) |