Refilling in the trenches / all foundations as directed with approved murum obtained from excavated material in 15 cm to 20 cm layers with all leads and all lifts including watering & compaction etc. complete.

Это описание этапа работ. Не могу понять первую часть. Закапываются какие-то вырытые trenches / all foundations.
Помогите, пожалуйста :)

 paderin

link 20.07.2015 4:50 
обратная засыпка

 esignatyeva@mail.ru

link 20.07.2015 5:02 
обратная засыпка чего?

дальше идет

After the structural foundation and plinth construction is over the space between ground level and such level below top of plinth depending upon the depth of flooring, it bedding and foundation is to be filled in with approved excavated materials watered and compacted.

 paderin

link 20.07.2015 5:06 
котлованов и(или) всех фундаментов

 esignatyeva@mail.ru

link 20.07.2015 5:09 
котлован?

 esignatyeva@mail.ru

link 20.07.2015 5:10 
опередили))

 esignatyeva@mail.ru

link 20.07.2015 5:55 
а все эти
with all leads and all lifts

порядовка и высота слоя?

Все эти ваши - подвоз (подброс, подача, наброс, накид, подсып - что угодно) грунта и подъем грунта.

 