Subject: Geobag и PFA gen.
Всем доброго дня!

Помогите пожалуйста с переводом ниже

in page 3 we calculate that your proposed profile (-25.25 mBD crest, one layer of geobags) would require 347,000 m3 to reach the COF location.

Что такое geobag и COF location?

Заранее благодарен!

 trtrtr

link 2.06.2014 12:53 
geotextile dewatering bags
геотекстильный мешок, мат, контейнер

 trtrtr

link 2.06.2014 12:55 

 Zhanabil90

link 2.06.2014 13:00 
спасибо а как можно перевести COF?

 trtrtr

link 2.06.2014 13:01 
Не знаю. А о чем там речь?

 Zhanabil90

link 2.06.2014 13:22 
. preliminary conclusion on feasibility of TCO proposed profile
- page 4 shows that the TCO proposal would require 500,000 m3 (crest -25.25 m BD) for the construction road, or 399,000 m3 for a lower crest level
(-25.5 m BD).
- we took the critical surge condition as the sum of wave and water level.
The -25.25 m crest has a return period of 1.8 years, -25.25 m once per year
- We recommend -25.25 m BD, to keep risk of disturbance limited (compaction of the fill layer under placing is only possible if the water level is at least 0.5 m below the fill level)
- conclusion is that TCO profile at the same level would require 138 days to reach COF, 3 month more (early December)
- do you agree with this conclusion?

вот в таком касается как бы железнодорожным работам

 trtrtr

link 2.06.2014 13:41 
Construction of facility пришло в голову, но сильно сомневаюсь.

 