|
link 2.06.2014 12:47 |
Subject: Geobag и PFA gen. Всем доброго дня!Помогите пожалуйста с переводом ниже in page 3 we calculate that your proposed profile (-25.25 mBD crest, one layer of geobags) would require 347,000 m3 to reach the COF location. Что такое geobag и COF location? Заранее благодарен! |
geotextile dewatering bags геотекстильный мешок, мат, контейнер |
http://www.uat.com.au/images/GeoBags/Flyer - Geobag (LR-Sec).pdf http://sv-servisvostok.ru/geobag.pdf |
|
link 2.06.2014 13:00 |
спасибо а как можно перевести COF? |
Не знаю. А о чем там речь? |
|
link 2.06.2014 13:22 |
. preliminary conclusion on feasibility of TCO proposed profile - page 4 shows that the TCO proposal would require 500,000 m3 (crest -25.25 m BD) for the construction road, or 399,000 m3 for a lower crest level (-25.5 m BD). - we took the critical surge condition as the sum of wave and water level. The -25.25 m crest has a return period of 1.8 years, -25.25 m once per year - We recommend -25.25 m BD, to keep risk of disturbance limited (compaction of the fill layer under placing is only possible if the water level is at least 0.5 m below the fill level) - conclusion is that TCO profile at the same level would require 138 days to reach COF, 3 month more (early December) - do you agree with this conclusion? вот в таком касается как бы железнодорожным работам |
Construction of facility пришло в голову, но сильно сомневаюсь. |
You need to be logged in to post in the forum |