Subject: Broad Crested construct. Hydraulic DesignMomentum Method: balance momentum equation thru bridge cross sections with drag forces on the pier(s) accounted for: Weir flow (Broad Crested): Q = L x g0.5 x yc1.5 (- sorry, формула покорежилась) Мой перевод: может "пик нагрузки" -? Подскажите кто разбирается в предмете.... |
Broad crested weirs are robust structures that are generally constructed from reinforced concrete and which usually span the full width of the channel. They are used to measure the discharge of rivers, and are much more suited for this purpose than the relatively flimsy sharp crested weirs. http://www.jfccivilengineer.com/broad_crested_weir.htm Водослив с широким порогом? |
|
link 7.08.2009 2:55 |
Oo - спасибо большое! Похоже на то, что нужно. |
You need to be logged in to post in the forum |