|
link 19.03.2009 11:07 |
Subject: which are evaluated in „2 out of 3“ measurement как тут лучше перевестиwhich are evaluated in „2 out of 3“ measurement контекст: 2.2 Turbine Protection System The TPS includes two independent parts: • overspeed protection system WOODWARD ProTech 203 • turbine protection system The TPS also includes the automatic turbine testing system. The TPS will shut-down the turbine using the following process conditions, which are evaluated in „2 out of 3“ measurement (standard 3 binary + 1 analogue for additional control) selection philosophy: • Lubricating oil – low pressure 2/3 • Control fluid in the HP hydraulic system – low pressure 2/3 • Vacuum – high pressure 2/3 и т.д. |
если совпадут 2 из 3 критериев/параметров/условий |
You need to be logged in to post in the forum |