|
link 14.03.2008 5:23 |
Subject: Fit the Minimum Cement level??????????????????????????? POSITIONING THE SILO ON THE BLOCKFit the lifting cable to the Silo with the clevises provided Fit the Minimum Cement level. Lift the Silo with lifting gear with double chains 3 m. long. |
Установите индикатор минимального уровня заполнения цементом |
You need to be logged in to post in the forum |