Контекст:
Design, supply, delivery, installation, testing & commissioning on turnkey basis of 230kV Siddhirganj substation comprising of five(5) diameters of 11/2 breaker system, for connection of two 230kV overhead line bays, two 230kV underground line bays, two transformer bays and four future line bays (total 10 bays) including two (2) sets. of 230/138/34.5kV, 225/300(ONAN/ONAF)MVA three-phase auto-transformers, and modification work for *****upgrading jackbus conductor***** and jumper conductors of two (2) diameters of the existing 132kV switchyard at Siddhirganj 132/33kV substation.

 