|
link 20.12.2007 21:38 |
Subject: recovery pit recovery pit - ?The slab at ground level will be designed taking into account the HRSG cleaning drains; the relevant acid water will be collected into the relevant recovery pit. заранее спасибо |
сборный колодец (не DEMAG установка какая-нибудь?) |
You need to be logged in to post in the forum |